Pricing electrical work when the testing is the job

The visible work gets priced and the testing gets given away. A worked consumer unit quote with certificate time costed, per-point pricing, and why fault-finding is not a favour.

An electrician’s quote usually prices what the customer can see: sockets, downlights, a new consumer unit, cable. The work that takes the most skill and carries the most liability — testing, certifying, and finding the fault nobody could describe — is the part that quietly gets included for nothing. It is the most common way a competent electrician ends up earning less per day than a competent plasterer.

The unit that makes the quote honest

Price the point, not the job. A point is a defined, installed, tested accessory: a double socket, a downlight, a spur, a shower feed. Each point carries cable, containment, accessory, labour, test time and a share of making good.

A rate card built from points does three things a job price cannot. It makes a variation a single line (“three additional double sockets, £X each”). It makes a like-for-like comparison between two quotes possible for the customer. And it lets you see which point types are actually profitable — usually a surprise, and rarely the ones you enjoy.

Build the card from real jobs, not from a feeling: for each point type, take the last five you installed and average the hours actually spent, including the second visit.

A worked quote

A consumer unit replacement, six downlights in a kitchen, three additional double sockets on a ring:

Line Unit Qty Amount
Consumer unit change, incl. tails, labels, schedule job 1 £620
Downlight, fire-rated, incl. cable and containment point 6 £58 each → £348
Additional double socket on existing ring point 3 £72 each → £216
Measured work £1,184
Test, certify and notify hours 3 £55/hr → £165
Making good, sundries, travel allowance 1 £75
Cost before margin £1,424
Margin, 20% £285
Quoted £1,709

The test-and-certify line is £165 and it is the line most quotes leave out. A consumer unit change is not an install plus a certificate; it is an install, a full test sequence, a schedule, a certificate, and a notification if the work is notifiable. On the day, that is closer to half a day than to the hour the job “feels” like.

Testing is a task with a duration

Condition reporting is the clearest example. A domestic EICR on a three-bed house involves sampling circuits, filling in schedules, and writing up observations — and the writing up is not paperwork around the job, it is the job. If a report at a landlord-rented property is quoted as “two hours on site”, the price is quietly including an evening.

The rules side matters too. Private landlords in England must have the installation inspected and tested at the intervals the regulations set, and be able to produce the report — the current guidance is on GOV.UK. Notifiable work in dwellings in England and Wales goes through building control under Part P, which is a certification and notification route with a cost attached — see GOV.UK on building regulations approval. Both of these are things the customer is paying for whether or not the quote names them, so name them.

The certificate has your name on it

Every certificate you issue carries the design, construction, inspection and testing responsibility as you have declared it. That is why the time is not optional: a certificate signed off in ten minutes on a job that took a day is a personal liability, and it survives longer than the van.

Practically: keep a copy of every certificate and schedule you issue, with the readings, and record the job it belongs to. When a customer sells the house four years later and the buyer’s solicitor asks, you will be the only person who has it — and being able to produce it in an hour is worth more than the fee for producing it.

Fault-finding, priced as what it is

Fault-finding is the one job where quoting a fixed price is a bet against your own diagnostic skill. Price the first hour as diagnosis, state plainly that the fix is separate, and give a range once you know what you are dealing with. If the customer wants a cap, put the cap on the total and put the exclusion in writing: below a certain point, a fault cannot be diagnosed without opening something up.

The exception is repeat work for a landlord or a builder, where a fixed call-out plus hourly rate is what they want and the volume justifies the risk. Decide which of the two you are doing before the conversation, because the number you say first is the number you will be held to.

What the pack is

Three workbooks: a quote builder organised by point type with the per-point unit rates you set yourself, a job tracker that keeps each job’s test results and certificate reference beside its price, and a rate card that shows what each point type actually earns after the hours on the clock.